ISCO & Extraction Treating LNAPL

Share on facebook
Facebook
Share on google
Google+
Share on twitter
Twitter
Share on linkedin
LinkedIn

Corrosion of an oil water separator at an operating locomotive service building resulted in the
release of LNAPL into the subsurface. ORIN successfully treated soil and groundwater utilizing a combination of in-situ chemical oxidation and vacuum extraction. Nine injection points were advanced to an injection interval of 15 to 10 ft bgs using Geoprobe direct push technology with each point receiving an average of 50 gallons of treatment chemistry. Four points received an additional 25 gallons each for a total of 550 gallons.

Three nearby wells were used as extraction wells to allow for hydraulic control of groundwater to assist with the distribution of the remedial chemistry and to remove free product and highly contaminated groundwater. A VAC truck was present to vacuum extract from the extraction wells during all injection activities. Approximately 1,300 gallons was extracted during the pilot test.

More to explorer